Clarke FG2000 Specifikace Strana 1

Procházejte online nebo si stáhněte Specifikace pro Generátory energie Clarke FG2000. Clarke FG2000 Specifications Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 16
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Section: R500.E153C
Bulletin: E153-C
Date: 5-10-09
Supersedes: E153-A-1
16633 Foltz Parkway, Strongsville, OH 44149 USA
Telephone: (440) 572-1500 Fax: (440) 238-8828
www.clark-reliance.com
Prismatic and Flat Glass
Water Gage Maintenance
Instructions
Worlds Leader in Boiler Trim
Instrumentation & Controls
Flat Glass Gage Glass Prismatic Gage Glass
Zobrazit stránku 0
1 2 3 4 5 6 ... 15 16

Shrnutí obsahu

Strany 1 - Instructions

Section: R500.E153CBulletin: E153-CDate: 5-10-09Supersedes: E153-A-116633 Foltz Parkway, Strongsville, OH 44149 USATelephone: (440) 572-1500 Fax

Strany 2

10Wiring instructions for the Clark • Reliance GL53 Illuminators (for 'C' and 'S' Series Gages).Note: Make sure that the power is

Strany 3

11Wiring instructions for the Standard and Vertical Clark • Reliance Flat Glass Gage Illuminators Note: Make sure that the power is turned off to the

Strany 5

13Confirm that the correct supply voltage is being applied to the illuminator power supply. The unit has been manufactured for a specific power source

Strany 6

14RECOMMENDED SPARE PARTS1 per sectionRepair Kit (incl. Glass & Gaskets)RK-35EC9 or S91 per sectionRepair Kit (incl. Glass & Gaskets)RK-35DC8

Strany 7

15*** REPLACEMENT PARTS WARNING ***The use of non-Original Equipment Manufacturer parts (such as glass, gaskets, probes, modules, etc.) will void th

Strany 8

16633 Foltz Parkway Strongsville, OH 44149 USAPhone (440) 572-1500 Fax (440) 238-8828 [email protected] www.clark-reliance.comcla

Strany 9

2Unpacking and inspectionUpon receipt of the Boiler Drum Level instruments, examine the contents of the container(s) for damage. Report any faulty con

Strany 10 - • Reliance GL53 Illuminators

3Boil-out Gage Practice and Policy On new boiler installations, it is common procedure to initially operate the boiler at a reduced pressure for a sho

Strany 11 - • Reliance

4Recommended Blow-Down Procedure for Water Columns and Gage GlassesThe importance of proper cleaning and maintenance of the water column and the water

Strany 12

53. Always notify control room personnel prior to conducting a Blow-Down to prevent any false alarms or false trips.Recommended Maintenance and Annual

Strany 13

6Prismatic and Flat Glass GagesBEFORE YOU INSTALL THE GAGE GLASS:- Support brackets should be considered for gages over four feet long and weighing in

Strany 14 - RECOMMENDED SPARE PARTS

7Disassembly:-After pressure is relieved from the gage glass, remove from the boiler drum and lay flat on a workbench-Loosen end bolting first, workin

Strany 15

8Recommendations and Instructions for Hot Torquing Gage Glasses and Probe Type DevicesWhen a new piece of equipment, whether a Gage Glass or a Probe*

Strany 16 - "PARTS-PLUS"

9Installation Instructions for Model GL-53 Water Gage Illuminators forTubular Glass Gages or Prismatic Gages1. General InformationModel GL-53 Water Ga

Komentáře k této Příručce

Žádné komentáře